Our services can be taken separately or under a single contract. On a turnkey basis, design, procurement, construction and handover are all the contractor's responsibility.
01
Concept design, detailed design, manufacturing and site management run under a single contractor. Costs are developed alongside the design, so the budget is clear before construction begins.
single contract · fixed price or open book
Turnkey delivery of a commercial space, whether it is a completed shell or already in use. In existing spaces we survey the site before works begin, identifying services and structure ahead of any strip-out.
shell & core · existing space · live environment
Fit-Out Works
Partition walls, suspended ceilings, floor and wall finishes, paintwork, glazed partitions, doors and joinery, and acoustic panelling. Every detail is drawn before manufacture and confirmed against site measurements.
MEP
Power, HVAC, plumbing, fire detection and suppression, low current and lighting systems. Coordination between disciplines is completed during detailed design. Testing and commissioning are carried out by our own team.
Joinery
Reception desks, fitted storage, counters and wall panelling are drawn specifically for the project, manufactured in the workshop and delivered to site ready for installation. Timber, lacquer, metal and composite surfaces are detailed to the same standard.
FF&E
Specification, procurement, layout and installation of furniture, fixtures and equipment. Selection runs alongside the detailed design and is treated as part of the fit-out scope.
specification and procurement · layout and installation
The client deals with one project manager throughout. Budget, procurement, subcontractor coordination and the programme are all tracked under that single point of contact. Progress and any delays are reported to the client weekly.
Refurbishment
Phased works in spaces that stay open. Noisy and dusty activities are carried out outside working hours. Work areas are handed back ready for use at the start of every business day.
phased works · out-of-hours working
02 Projects
Scope, area and duration are listed for every project. The photographs are from completed works.
Turnkey office fit-out on a shell-and-core floor. Open-plan areas, meeting rooms and social spaces were completed under a single programme.
Fit-out to brand standard within a shopping centre. The works ran on the night shift and were completed in time for the opening date.
Repeat room production following mock-up room sign-off. Public areas and the lobby were delivered within the same programme.
Kitchen ventilation and the extract duct route were resolved during design; the dining room and bar joinery were coordinated around them.
03 Sectors
Office, retail, hotel and restaurant projects. Scope is set by how the space is used, what it demands technically and when it has to open.
04 Process
Each stage produces what the next one needs. Survey measurements shape the design, design decisions shape what gets bought, and lead times shape the site programme.
01 / 05
We visit the space, take measurements and identify the existing services and structure. Knowing the constraints before any design decision is what keeps the budget and programme accurate.
02 / 05
Concept, layout and material decisions are worked up into the detailed design. Every decision is assessed for how it will be built and what it will cost.
03 / 05
The programme, procurement plan and subcontractor packages are prepared at this stage. Long lead items and sample approvals are dealt with first.
04 / 05
Site runs on daily coordination and staged quality control. Because clashes between disciplines were resolved during detailed design, revisions on site stay to a minimum.
05 / 05
The snag list is consolidated and closed out through a defined handover process. As-built drawings, warranty certificates and operating information are handed over to the client. Items within the agreed warranty scope are addressed during the warranty period set out in the contract.
05 Approach
Whatever the scale or scope of the project, these four things are done the same way on every job.
Design, procurement, site and handover sit under single management. Anything that falls between disciplines is the contractor's to resolve.
Junction details, joint alignments and tolerances are defined in the detailed design and checked against site measurements before manufacture.
If a supply or manufacturing delay comes to light, the client hears about it the same day rather than in the weekly report.
The snag list is drawn up as a whole and closed out to an agreed timetable, rather than left to drag on in stages after handover.
06 Materials
Build quality depends as much on how a junction is resolved as on the material itself. Junction details, tolerances and the installation sequence are designed alongside the material decisions.
01 / 06
Grain direction, veneer matching and edge details are set on the drawings. Panel joints are positioned to the grid of the space.
02 / 06
Profile sections, glass thickness and installation tolerances are calculated together, and detailed so that no gasket or fixing is left on show.
03 / 06
Joint layouts, movement joints and transition details are resolved before installation. Level differences between floor finishes are taken up in the screed.
04 / 06
Acoustic surfaces, services above the ceiling and lighting are coordinated on a single reflected ceiling plan. In open-plan offices, acoustic performance is calculated during design.
05 / 06
Lux levels, colour temperature and fitting positions are set on the ceiling plan according to how the space will be used.
06 / 06
Desks, storage and fitted furniture are drawn to the millimetre, manufactured in the workshop and installed on site in a single visit.
Send us a floor plan, an approximate area and a target opening date. We will review the scope and outline the next steps.
Start a project07 Contact
A floor plan, the number of users and an approximate area are enough for us to assess your enquiry. If you do not have them yet, get in touch anyway; we fill in the gaps during the site survey.